SSC CPO 2024 PYQ — Question 125

SSC CPO 2024 - 27th June 2024 - Shift 1 • Quantitative Aptitude • Q125

A can complete a piece of work alone in 200 days, while B can complete the same piece of work alone in 100 days. In every three-day cycle, both A and B work on day 1, only A works on day 2, and only B works on day 3. This cycle continues till the work is completed. How many days in all does it take the duo to complete the work?

Show answer & explanation

Correct answer: B

Explanation

The correct answer is Option 2 i.e. 9923\frac {2}{3}.

Work done by A in one day = 1/200 and,

Work done by B in one day = 1/100

So,

Total work done by A and B in 1 day = 1/200 + 1/100 = 3/200

Now,

Work done by A on day 2 = 1/200

Work done by B on day 3 = 1/100

So,

Total work done till day 3 = 3/200 + 1/200 + 2/200 = 6/200 = 3/100

Total work to be done = 1 (whole work)

Number of 3-day cycles needed to complete the work:

⇒ Total work/Work done in each cycle = 1/(3/100) = 100/3

Total days needed = Number of cycles × 3 days per cycle

⇒ (100/3) × 3 = 100 days

Since the work is completed in fractions of a cycle, we need to calculate the exact number of days:

⇒ 100/3 = 33 cycles and 1/3 cycle remaining

For the remaining 1/3 cycle:

Day 1: Work done = 3/200 (A and B together)

Day 2: Work done = 1/200 (A alone)

Day 3: Work done = 1/100 (B alone)

Total work done in 1/3 cycle:

⇒ 1/3 × (3/200 + 1/200 + 1/100) = 1/3 × (3/100) = 1/100

Hence, the remaining work after 33 cycles:

⇒ 1 - 99/100 = 1/100

Additional day required to complete the remaining 1/100 of work by A alone

⇒ 1/200 × 2 = 1/100

So,

Total days

⇒ 33 cycles × 3 days + 1 additional day 

⇒ 99 - 2/3 =  9923\frac {2}{3} days