SSC Selection Post 2024 PYQ — Question 67

SSC Selection Post - Higher Secondary Level - 25 June 2024 - Shift 2 • Quantitative Aptitude • Q67

X and Y can do a piece of work in 18 days and 27 days, respectively. Starting with X, they work on alternate days. The whole number of days to complete the work by X and Y is:

Show answer & explanation

Correct answer: D

Explanation

The correct answer is Option 4 i.e. 22.

X’s 1 day work = 1/18

Y’s 1 day work = 1/27

In 2 days (X + Y):

= 1/18 + 1/27 = (3 + 2)/54 = 5/54

Work in 10 such days (20 days) = (5/54) × 10 = 50/54

Remaining work = 1 − 50/54 = 4/54 = 2/27

21st day → X’s turn → does 1/18 work

Check: 1/18 > 2/27 → Yes

Let required fraction of day = x

x/18 = 2/27 → x = (2/27) × 18 = 4/3 days

So, total time = 20 full days + 4/3 day = 21⅓ days

Answer: 22 days (whole number of days required)