Two trains P and Q start from stations S and T towards each other. Train P takes 4 hours 48 minutes and train Q takes 3 hours 20 minutes to reach T and S, respectively, after they meet. If the speed of train P is 45 km/h, what is the speed of train Q?
Show answer & explanation
Correct answer: C
Explanation
The correct answer is option 3 i.e. 54 km/h
Given:
After meeting each other, time taken by P = 4 hours 48 minutes and
time taken by Q = 3 hours 20 minutes to reach stations T and S respectively
Speed of P = 45 km/h
Concept Used:
If two trains run with the speed of x km/hr and y km/hr and they reach their destination after meeting each other in t1 and t2 hours respectively, then
...(i)
Explanation:
Let the speed of Q be x km/hr.
Using equation (i), we get
Now, 3 hours 20 minutes = 10/3 hours
And 4 hours 48 minutes = 24/5 hours
⇒
⇒ (45/x)2 = 25/36
⇒ (45/x)2 = (5/6)2
⇒ 45/x = 5/6
⇒ x = 54
Hence the speed of Q is 54 km/h.