Two pipes can fill a cistern in 12 hours and 16 hours, respectively. The pipes are opened simultaneously and it is found that due to leakage at the bottom, it takes 90 minutes more to fill the cistern. How much time will the leakage take to empty the completely filled tank?

Show answer & explanation

Correct answer: B

Explanation

The correct answer is option 2 i.e 38104938\frac{10}{49}h.

Given:

Time taken by first pipe = 12 hours

Time taken by second pipe = 16 hours

Concept used:

Work done = efficiency × time

Calculations:

Total work done (LCM of 12 and 16) = 48 units

Efficiency of first pipe = 481248\over 12 = 4

Efficiency of second pipe = 481648 \over 16 = 3

Total efficiency = 7

Time taken by 1st and 2nd pipe together = 48748 \over 7 hours

Time taken due to leakage by both pipes = 48748 \over 7 + 323 \over 2 = 11714117 \over 14 hours

Required time taken = [48×14117{48 \times 14} \over 117] - 7 = 1872491872 \over 49

⇒ 38104938\frac{10}{49} h