The actual production of AC Machines in April was what percentage more than the average target production of AC Machines over five months?
Show answer & explanation
Correct answer: B
Explanation
The correct answer is option 2 i.e. 100/9%
|
Application |
|
Actual production in April = 80 Average target production over 5 months = (60 + 30 + 80 + 90 + 100)/5 = 360/5 = 72 Hence, Required percentage = [(80 – 72)/72] × 100 = 100/9 %
|