Read the below statements marked as Assertion (A) and Reason (R).
Assertion (A): The Union Cabinet approved a MoU allowing India to withdraw 1.82 cusecs of water from the Feni River for Sabroom town in Tripura.
Reason (R): Sabroom town already receives sufficient groundwater supply with low iron content.
Mark the correct option:
Show answer & explanation
Correct answer: C
Explanation
Correct Answer
A is true, but R is false
Explanation
Statement (A) is correct because the Union Cabinet approved a Memorandum of Understanding (MoU) for drawing 1.82 cusecs of water from the Feni River for Sabroom town in Tripura. The aim of this decision was to strengthen the drinking water supply in the region.
Statement (R) is incorrect because Sabroom town did not already have sufficient groundwater with low iron content. The area faced issues related to water availability and quality, which is why the decision was taken to supply water from the Feni River.
Key Points
• The purpose of the Feni River water allocation was to improve drinking water supply.
• Sabroom region faced limitations in groundwater resources.
• The arrangement is linked with India–Bangladesh water cooperation.
Additional Facts
• The Feni River flows between Tripura (India) and Bangladesh.
• The project is part of cross-border water management cooperation.
• 1.82 cusecs of water was allocated for Sabroom.