Arrange the passage correctly:
(1) Place the shirt on the ironing board.
(2) Plug in the iron and adjust the temperature.
(3) Begin ironing the shirt gently.
(4) Wait for the electric iron to heat up.

Show answer & explanation

Correct answer: A

Explanation

Correct Answer

2 - 4 - 1 - 3

Explanation

To solve this arrangement question, you need to follow the natural, chronological step-by-step process of performing an everyday task—in this case, ironing a shirt.

Sentence (2) must happen first. You cannot use an electric appliance without connecting it to a power source, so plugging it in and setting the temperature is the initial step.

Sentence (4) naturally follows sentence (2). Once the iron is plugged in, you must wait for the heating element to reach the selected temperature before you can use it.

Sentence (1) happens while or right after the iron heats up. You prepare the garment by laying it flat on the ironing surface.

Sentence (3) is the final action. Now that the iron is hot and the shirt is positioned properly, you can actually begin the physical act of ironing.

Following this logical timeline, the correct order of operations is 2 -> 4 -> 1 -> 3.

Key Points

When dealing with process-based sequence questions, look for technical dependencies. An appliance must always be plugged in (2) and heated (4) before any actual work (3) can take place.