SSC CGL 2024 PYQ — Question 68

SSC CGL - 17 Sep 2024 - Shift 2 • Quantitative Aptitude • Q68

A cistern can be filled by two pipes in 8 minutes and 10 minutes, separately. Both the pipes are opened together for a certain time, but due to an obstruction, only 5/8 of the full quantity of water flowed through the former pipe and 3/5 through the latter pipe. However, the obstruction was suddenly removed, and the cistern was filled in 3 minutes from that moment. How long did it take before the full flow began?

Show answer & explanation

Correct answer: B

Explanation

The correct answer is option 2 i.e. 26172{6\over17} minutes.

Let the total work to be done (LCM of 8 and 10) be 40 units.

Efficiency of first pipe = 5 units/minute

Efficiency of second pipe = 4 units/minute

Water flow from first pipe after obstruction = 5 × (5/8) = 25/8 units/minute

Water flow from second pipe after obstruction = 4 × (3/5) = 12/5 units/minute

Work done by both pipes in last 3 minutes = (5 + 4) × 3 = 27 units

Remaining work = 40 - 27 = 13 units

Now, required time = 13/[25/8 + 12/5] 

⇒ (13 × 40)/221

⇒ 40/17 = 26172{6\over17} minutes