A can do a certain work in 40 days. B is 60% more efficient than A. Both work together for 10 days. C alone completes the remaining work in 101210{{1} \over 2} days. Working together, B and C can complete  44% of the original work in:

Show answer & explanation

Correct answer: B

Explanation

The correct answer is Option 2 i.e. 6 days.

A can do full work in 40 days

A’s 1 day work = 1/40

B is 60% more efficient

B’s 1 day work = 1/40 × 160% = 1/25

A + B work 10 days , Work done = (1/40 + 1/25) × 10 = 13/20

Remaining work = 1−13/20 = 7/20

C completes 7/20​ work in 10.5 days , C’s 1 day work = 7/20 ÷ 10.5 = 1/30

B + C = 1/25 + 1/30 = 11/150

Time to do 44% work = 44/100 ÷ 11/150 = 6 days