SSC Selection Post 2025 PYQ — Question 33

SSC Selection Post - Graduation Level - 24th July 2025 - Shift 3 • Quantitative Aptitude • Q33

A and B together can finish a work in 18 days, B and C in 24 days, and C and A in 36 days. In how many days can B alone complete the work?

Show answer & explanation

Correct answer: A

Explanation

a + b = 1/18

b + c = 1/24

c + a = 1/36

Adding the three equations -

2(a + b + c) = 1/18 + 1/24 + 1/36

= (4 + 3 + 2)/72

= 9/72

= 1/8

a + b + c = 1/16

b = (a + b + c) − (a + c)

= 1/16 − 1/36

= (9 − 4)/144

= 5/144

Time taken by B to complete the work -

= 144/5

= 28.8 days