A and B can finish the work in 6 days and 4 days, respectively. A alone worked on it for 2 days. Thereafter, B joined him. How much total time was taken by them to finish the work?
Show answer & explanation
Correct answer: A
Explanation
The correct answer is option 1 i.e. 3 days.
A and B can finish the work in 6 days and 4 days, respectively.
Let the total work = 12 (LCM of 6 and 4)
Efficiency of A = 12/6 = 2
Efficiency of B = 12/4 = 3
Work done by A in 2 days = 2 × 2 = 4
Remaining work = 12 - 4 = 8
Time required for A and B to do remaining work = 8/(2 + 3) = 8/5 = days
Total time = 2 + = days
Therefore, the time required to finish the work is days.