SSC GD 2025 PYQ — Question 52

SSC GD Const 2025 (English) - 13 Feb 2025 - Shift 1 • Quantitative Aptitude • Q52

A and B can do a piece of work in 28 days; B and C can do the same work in 18 days and A, B and C together can do it in 16 days. The time required (in days) to finish the work by A and C is:

Show answer & explanation

Correct answer: A

Explanation

The correct answer is Option 1 i.e. 29111729\frac{11}{17}

A + B = 1/28

B + C = 1/18

A + B + C = 1/16

C = 1/16 − 1/28 = 3/112

B = 1/18 − 3/112 = 29/1008

A = 1/28 − 29/1008 = 7/1008

A + C = 7/1008 + 3/112 = 34/1008 = 17/504

Time = 1 / (A + C) = 504/17 = 29111711\over17