A and B can do a piece of work in 18 days, B and C can do the same work in 32 days and A and C can do the same in 52 days. The time taken by A, B and C together to do the work is:

Show answer & explanation

Correct answer: A

Explanation

The correct answer is option 1 i.e. 18342397342\over397 days.

Given: A + B = 1/18

B + C = 1/32

A + C = 1/52

Add all three: (A + B) + (B + C) + (A + C) = 1/18 + 1/32 + 1/52

→ 2(A + B + C) = LCM of 18, 32, 52 = 7488

→ Sum = (416 + 234 + 144) / 7488 = 794 / 7488

Now: A + B + C = (794 / 7488) ÷ 2 = 397 / 7488

Time = 7488 / 397 ≈ 18342397342\over397 days