SSC GD 2024 PYQ — Question 48

SSC GD Const (English) - 20 Feb 2024 - Shift 3 • Quantitative Aptitude • Q48

A and B can complete work alone in 20 days and 60 days respectively. They began the work together but A left the work after some days and B completed the remaining work in 12 days. After how many days from the beginning A left the work?

Show answer & explanation

Correct answer: A

Explanation

The correct answer is option 1 i.e. 12 days

the work done by B in 12 days

The work rate of B = 1/60 of the work per day

In 12 days, the work done by B = 1/60 × 12 = 12/60 = 1/5

Since B completed 1/5 of the work,

the remaining work to be completed by A and B together before A left = 1 − 15 = 45

Combined work rate of A and B = 1/20 + 1/60 = 1/15 of the work per day

Days A and B worked together = 4/5 ÷ 1/15 = 4/5 × 15 = 12 days